SJSU ME 195a Full Scale Controls Team Individual Blog - Week of 10/10

Alex Krause
SJSU ME 195a Full Scale Controls Team Individual Blog - Week of 10/10

Reality set in this week. Some of the goals the controls team were trying to meet would have been great to meet, but were mostly out of reach and would have required too much work. Considering past work and presentations at Maker Faire, we knew our main goal for the year was to make the bogie travel through the entirety of the track. With this goal in mind, we talked to the full-scale track team and we learned that the track shape was not what we thought it was going to be. At first, we thought the track was going to have a straight section and then approach a Y-intersection and the bogie would have to turn either left or right. The actual track just has one long stretch of track and has a left turn on it. For Maker Faire, the controls team's goal is to have two paths the bogie can take. It can either go the full straight distance of the track, reverse, turn left, and then return to its starting position, or it can turn left, reverse, go straight, and then return to its original position.
The team also talked to the full-scale bogie team to talk about how we are going to control the steering since we have a master and a slave bogie system design. We are going to be sticking with linear actuators, but how they are going to be implemented is still up for consideration. Justin has been doing a fantastic job of researching how brushless dc motors work so that when the time comes to work with them, we will know how to program them. I have been researching hall effect sensors and RFID tags to try and see which one is better to determine where the bogie is at all times on the track. By the end of this next week, I will have a decision on which one to use and a better idea of how the program will determine where the bogie is on the track during its movement.

Comments

Popular posts from this blog

SJSU ME 195b Full Scale Controls Team Individual Blog - Week of 5/1

SJSU ME 195b Full Scale Controls Team Individual Blog - Week of 4/17

SJSU ME 195a Full Scale Controls Team Individual Blog - Week of 8/29 & 9/5