Posts

Showing posts from March, 2019

SJSU ME 195b Full Scale Controls Team Individual Blog - Week of 3/27

Alex Krause SJSU ME 195b Full Scale Controls Team Individual Blog - Week of 3/27 This week, we received news from the full-scale motor team that the motors that we have are uni-directional and cannot break by itself. We now are adding another motor to the bogie, which means our team has to add more components into our controls system. This is also the last week we will be trying to fix the wireless communication problem. We are ordering new transceiver modules, and if those do not work, then we will not be using wireless communication in our system. Other than that, we will be working over spring break on making the motor system work and ordering the rest of the parts we need for our system. 

SJSU ME 195b Full Scale Controls Team Individual Blog - Week of 3/20

Alex Krause SJSU ME 195b Full Scale Controls Team Individual Blog - Week of 3/20 This week, we continued to have issues with figuring out our I2C communication work. We built a circuit that should have one Arduino flip a switch and an LED on another Arduino should light up. We ran the program but it was not working at all the way it was supposed to be. Professor Furman came to try and help us figure out what the problem was, but there was no luck. This next week will be the last week to figure out the I2C communication until the cut the idea, and we will also be making the motor move. 

SJSU ME 195b Full Scale Controls Team Individual Blog - Week of 3/6

Alex Krause SJSU ME 195b Full Scale Controls Team Individual Blog - Week of 3/6 This week, we gave our first round of presentations for the semester. The team prepared well for the presentation, and it showed in class. We really worked on making the images on our slides stand out and be more engaging to the audience by coupling them with animations. The rest of the week was spent finalizing our bill of materials and figuring out how much everything would be costing so we can start ordering our parts and assembling our controls system. 

SJSU ME 195b Full Scale Controls Team Individual Blog - Week of 2/27

Alex Krause SJSU ME 195b Full Scale Controls Team Individual Blog - Week of 2/27 This week, we did not meet during our normal class period because my team was at a career fair. We did meet over the weekend to work on our first presentation. The controls team feels very confident with the work that has been done up to this point. We have finalized the controls system design, the system hardware list, our PCB design, and our full controls system wiring schematic. For our presentation, we really focused on improving our Assertion-Evidence style of slides and using animations to help communicate our thoughts.